Sale!

Lasco Tee, 2-1/2″ Slip White PVC Schedule 40 | 401-025

Original price was: $12.79.Current price is: $10.15.

80 in stock

SKU: WZNA936492884 Category:

Description

Lasco 401025 (401-025) Schedule 40 PVC Tee2-1/2″ Slip x Slip x SlipWhite

The Lasco 401025 (often shown as 401-025) is a Schedule 40 PVC tee fitting with
2-1/2″ slip (socket) connections on all three ports. Its used to branch a 2-1/2″ line off a 2-1/2″ main run in
pool/spa plumbing, irrigation manifolds, and general water systems that use solvent-weld PVC fittings.

Key Features

  • Part Number: 401025 (also referenced as 401-025)
  • Fitting Type: Tee
  • Size: 2-1/2″ x 2-1/2″ x 2-1/2″
  • Connections: Slip (socket) x Slip (socket) x Slip (socket)
  • Material: Schedule 40 PVC
  • Color: White
  • Typical temperature rating: Up to 140F (PVC pressure applications)

Common Uses

  • Pool and spa plumbing manifolds and equipment pad layouts
  • Branching a 2-1/2″ line for additional returns, suction lines, or water feature circuits
  • Irrigation and general water plumbing where 2-1/2″ Sch 40 PVC is used

Installation Notes

  • Slip sockets are solvent-weld: Use PVC primer and PVC cement approved for pressure plumbing.
  • Dry-fit first: Confirm alignment, spacing, and valve/union clearance before gluing.
  • Full insertion: Mark pipe insertion depth and seat pipe fully into each socket while cement is wet.
  • Support the plumbing: Add pipe supports/hangers to reduce stress that can cause leaks or cracking over time.
  • Cure time: Allow proper cure time before pressurizing (varies by cement type, temperature, and humidity).

Related Products

  • Search: Lasco 401025 / 401-025
  • Search: 2-1/2″ Schedule 40 PVC Tees
  • Search: 2-1/2″ Schedule 40 PVC Pipe
  • Search: 2-1/2″ PVC Unions
  • Search: PVC Primer
  • Search: PVC Cement
  • Search: Lasco Schedule 40 PVC Fittings

Installation & Maintenance Tips

  • Keep sockets and pipe ends clean and dry during assembly; moisture and debris can weaken solvent-weld joints.
  • For best results, use fresh primer/cement and follow the cement manufacturers cure-time chart before starting the system.
  • Avoid using the tee as a structural support pointpipe strain can lead to hairline cracks over time.
  • If you expect future equipment removal, add unions nearby to avoid cutting pipe later.
  • After startup, inspect joints for seepage and address any pipe stress or misalignment immediately.